Concrete Calculator

Concrete calculator for slabs, footings and columns: cubic yards with waste allowance, 80/60/40 lb bag counts, and when to order ready-mix instead.

Uneven subgrade, spillage and form irregularities β€” 10% is the working default.

Concrete needed

2.72 ydΒ³

66.7 ftΒ³ in the forms + waste allowance; 1 ydΒ³ = 27 ftΒ³.

80 lb bags
123

Each 80 lb bag yields 0.60 ftΒ³ β€” 163 bags at 60 lb, 245 at 40 lb.

Order ready-mix instead
2.7 ydΒ³

Past about one cubic yard, bagged mixes cost more, arrive slower and finish weaker than a truck pour.

About Concrete Calculator

Concrete is the rare material where the arithmetic is easy and the logistics decide the project. The volume is length Γ— width Γ— thickness β€” the part everyone gets right. The decisions that cost money sit around it: the waste allowance for uneven subgrade and spillage (10% is the working default; skimping it means a cold joint in the middle of a pour), the bag count at 40, 50, 60 or 80 pounds, and the point where bagged concrete stops making sense and a ready-mix truck becomes the cheaper, faster, structurally better answer. This calculator runs all three: cubic yards for the truck order, bag counts for the small pour, and an explicit recommendation flag the moment the volume crosses about a cubic yard. Columns and post holes are handled as cylinders β€” enter the diameter in inches and the count, and the per-hole volume scales automatically.

The short answer

A 20Γ—10 ft slab at 4 inches is 66.7 ftΒ³ = 2.47 cubic yards before waste β€” 123 eighty-pound bags with a 10% allowance. Past about one cubic yard, order ready-mix instead: bags cost more, arrive slower, and a truck pour avoids the cold joints that weaken a big slab.

How to use Concrete Calculator

  1. 1

    Pick the pour shape

    Slab or footing for rectangles (length Γ— width Γ— thickness), column for cylinders (diameter Γ— height Γ— count).

  2. 2

    Enter the dimensions

    Length and width in feet, thickness in inches, column diameter in inches. The calculator converts everything to cubic feet, then to yards.

  3. 3

    Read yards, bags and the recommendation

    The result shows volume with waste, the bag count per size, and β€” above about a cubic yard β€” a ready-mix flag worth heeding.

Why use this tool

  • Cubic yards with the waste allowance built in, ready for a truck order
  • Bag counts at 80, 60, 50 and 40 lb from published yields
  • Slab, footing and column shapes β€” cylinders scale by hole count
  • Explicit ready-mix flag once the volume passes about one yard
  • Runs in your browser β€” site measurements never leave the page

Frequently asked questions

How many 80 lb bags of concrete do I need?

Divide the volume in cubic feet by 0.60 β€” the published yield of an 80 lb bag β€” and round up. A 20Γ—10 ft slab at 4 inches is 66.7 ftΒ³, which is 112 bags before waste; with a 10% allowance, 123. At 45 bags per cubic yard, any pour over a yard or two is usually cheaper as a ready-mix truck.

How much concrete is in a cubic yard?

One cubic yard is 27 cubic feet, which is 45 eighty-pound bags, 60 sixty-pound bags, or 90 forty-pound bags. Concrete is ordered by the yard because that is what the truck delivers in β€” 0.25-yard increments on most ready-mix loads.

How thick should a concrete slab be?

4 inches is the standard for a patio or walkway; 4-5 inches with reinforcement for a residential driveway carrying cars; 6 inches or more for trucks or heavy equipment. Thickness drives volume linearly β€” doubling it doubles the concrete, which is why the 4-inch default matters on every quote.

How much extra concrete should I order for waste?

10% is the working default for formed slabs on reasonably even ground; 15-20% on rough or sloped excavation where the subgrade is uneven. Running short mid-pour is worse than the extra bags cost β€” a pour that stops and restarts leaves a cold joint that permanently weakens the slab.

When should I order ready-mix instead of bags?

Past roughly one cubic yard. A single 10Γ—10 slab at 4 inches is 1.23 yards β€” about 66 eighty-pound bags, or two hours of mixing by hand for a pour that a truck finishes in ten minutes with better consolidation. Bags are for post holes, footings and small repairs; trucks are for slabs.

How do I calculate concrete for post holes?

Treat each hole as a cylinder: volume = Ο€ Γ— (diameter Γ· 2)Β² Γ— depth. A 12-inch hole 4 feet deep takes 3.14 ftΒ³ β€” about 6 eighty-pound bags each. Enter the diameter, height and hole count in the column mode and the calculator scales it across the run.